Spare ETH and auxiliary armatures at Bowers
Other work undertaken was to strip the poorer generator set, check all of the components, and to enable any parts to be cannibalised off this set if necessary. Here the two armatures are seen, Auxiliary to the left and damaged ETH to the right. 4th December 2008.