RRRG new website top logo resized

 

Restoration diary

Reports of restoration work on 50029 and 50030.

Work party report 1st September 2024

Work party report 1st September 2024
Richard, Dave, and I were on site yesterday. Dave is continuing testing pipework and various valves in the air system of Repulse. He has also mounted the extractor fan above where the ETH generator sits. I fitted and wired the AWS sunflower & reset button in No.2 cab, while Richard finished connecting the two-core cable from the sunflower ...
Continue reading
506 Hits
0 Comments

Work party reports 4th and 18th August 2024

Work party reports 4th and 18th August 2024
Exhauster fitted into place in 50030. Photo by Andy Rowlands.
Dave Rolfe has been putting air into the air system of 50030 at various points, looking for leaks, and inevitably, is finding a lot. He plans to work through the locomotive. This will reveal any more fractured, missing or broken airpipes. I added a new link wire between two terminal bars in No.1 cab as part of completing the unfinished DSD sys...
Continue reading
673 Hits
0 Comments

Work party report 12th November 2023

Work party report 12th November 2023
Air tanks refitted to 50030 by Dave Rolfe on 12th November 2023.
Mark Burrows gluing air filter rubber strips in 50030 on 12th November 2023.
​Dave Rolfe, Jay Hirst, Mark Burrows, Richard Dale and I were on site today. Jay and Mark were gluing rubber strips behind where the air filters will sit around 50030 to prevent them rattling. Dave continued cleaning and test-fitting various sections of air pipes on and around the brake frame. He has also refitted the four brake valves to the brake...
Continue reading
1030 Hits
0 Comments

Work party report 1st October 2023

Work party report 1st October 2023
​Dave Rolfe, Mark Burrows, Carl and Sofy Looker, Jay Hirst and I were on site today. Mark was sorting out the shims for when the ETH generator is fitted into Repulse, then removed the elbows from the broken airpipes in both cabs, to allow more room for the repairs. Dave carried on sorting out the stuck radiator louvres, and assi...
Continue reading
1358 Hits
0 Comments

Work party report 23rd July 2023

Work party report 23rd July 2023
​Dave Rolfe, Mark Burrows, Richard Wade, Jay Hirst and I were on site today. After barring round the power unit and oiling the turbos, Dave and Mark began investigating the broken air pipes I'd discovered under the floor in No.1 cab, finding virtually all those that dive through the plating under the cab floor had corroded away, on both t...
Continue reading
1299 Hits
0 Comments