RRRG new website top logo resized

 

Restoration diary

Reports of restoration work on 50029 and 50030.

Announcement of working party dates and details of restoration work carried out at working parties.

Work party report 24th August

Work party report 24th August

A good day on site today. Former regular working member Wes Needle joined us for today's workparty.  Since getting married and starting a family, Wes hasn't had much time to indulge his chosen hobby, but because they had taken a break in a holiday cottage not far from Rowsley, he was able to take a day to join us while his wife Keren and the nippers went on the train.

Dave Rolfe continued cleaning and painting power unit pipework, then he, Wes, Peter Carter and Ian Kemp finished overhauling one of the intercoolers and reassembled it. They also started unfastening one of the compressors on 50030 ready for it to be removed as there is an overhauled one ready to take its place.

 

b2ap3_thumbnail_052.JPGb2ap3_thumbnail_053.JPG

 

I located the fittings and tubing I had purchased some time ago to replace the air circuit in Repulse. There are different threads that have been used on these fittings at various times, so it was a bit of a gamble whether we had chosen the right thread, but fortunately when I tried the fittings in the motor and divert contactors, they screwed in fine. I had made a diagram some time ago of the routing and connections of the air circuit in 50021, so I am now able to copy it in Repulse. I also finished off connecting up the newly-fitted reverser in the electrical cubicle of 50030 with all its wiring and connections.  Even the weather was kind to us!

 

b2ap3_thumbnail_060.JPGb2ap3_thumbnail_059.JPG

 

Continue reading
5207 Hits
0 Comments

Work party reports 29th June and 14th July

Work party reports 29th June and 14th July

On 29th June a long-running sub-project within the electrical restoration of 50030 took a substantial step forward. I got the proper reverser (Class 50 specification) fitted into Repulse, with help from Dave Rolfe, Peter Carter and Ian Kemp as it's so damned heavy. We had to jiggle it about to get it to fit properly, but did it in the end. I attached the divert cables at the rear, but didn't have time to do the auxilaries at the front as I showed two visitors round Repulse. We are always happy to show enthusiasts around our project so if you want to take a look inside our locomotives then get in touch with us either via the website or our Facebook pages and we will do our best to accommodate you.

 

 

b2ap3_thumbnail_086.JPG b2ap3_thumbnail_083.JPG

 

 

Also on this date Dave, Ian and Pete also continued sorting fuel and water pipework recovered from 50030's power unit to replace damaged sections on the ex-50008 unit.  This unit is destined for use in 50030 when complete - the existing power unit in Repulse was in acceptable condition when we acquired the loco, but has high engine hours and as part of our policy of overhauling our 50s to a very high standard in order to give them a long and trouble-free career in preservation we decided to overhaul one power unit totally.  The existing unit in Repulse will be re-used inside 50029 because the engine in Renown has serious problems following the seizure which ended the loco's BR career.  We don't know for sure but are aware of the possibility that the unit in 50029 may only be usable as a source of spares.  Power unit work can be one of the most gruelling of the practical restoration projects as the same task often has to be done at least sixteen times, sometimes even 32 or 64 times!

 

b2ap3_thumbnail_081.JPG b2ap3_thumbnail_079.JPG

 

On 14th July I attached the reverser auxiliary contact wiring after showing another visitor round Repulse. Meanwhile, Ian, Pete and Dave fitted the fuel feed and return pipes to the ex-50008 power unit that they had previously salvaged from the power unit inside Repulse.

 

Continue reading
6686 Hits
0 Comments

Work party report 15th Jun

Work party report 15th Jun

As it rained almost all day yesterday, even though the forecast was for dry weather, I decided not to cart the reverser outside as I've cleaned it, so I test fitted the newly-made CU2 field divert and CU7 ETH detector units into 50030's elec cubicle. While the CU7 can go in its original position, the original position for the CU2 had the cable connections very close to the cubicle frame, so I drilled a couple more holes to put it in a better position.
 
Inbetween the heavier bursts of rain, Ian and Pete removed the fuel feed pipes from 008's power unit as they'd been bent during the lift at Crewe when we bought and moved the PU about 8 years ago. Dave was painting pipes taken from the PU inside Repulse to replace them.
 
I also took the opportunity to get some more pictures of Mark's work last weekend on the generator conduits.
b2ap3_thumbnail_Gen-conduits-2-June-2014.JPG

Continue reading
5163 Hits
0 Comments

Work party report 7th June

Work party report 7th June

Dave Rolfe and I had a very wet Saturday at Rowsley last weekend (I'd gone on the Saturday as Sunday was my Wedding Anniversary), the weather finally cleared around 5 o'clock!

Given the weather we both found things indoors to occupy ourselves, Dave spent part of the day unbolting and freeing off sections of the radiator louvre operating mechanism. His remaining time was spent sorting out the various fittings, clamps, etc, that are needed to refit the fuel rails to the power unit, and checking their condition, cleaning and painting the metal sections of the clamps. I spent most of the day in 50030's generator room sorting out the best sections of conduit, from our collection of bits ex-50023, 50030 and 50040, to make up the remaining set of conduits. By the end of the day, I had cut sufficient sections to lay out the last of the conduit runs, all that remains to do now with this job is to strip the years of paint and dirt off them, thread the ends of the cut sections and fit the relevant couplers and locking nuts. Hopefully another day's work should see the conduit conundrum resolved. In the process I also identified ¾ of a set for one side of 50029.

Continue reading
6649 Hits
1 Comment

Work party reports 25th May and 1st June

Work party reports 25th May and 1st June

If you've been following RRRG for some time, you might know that we have in our spares stock a genuine Class 50 reverser and a Class 37 example, which is similar but not identical to the Class 50 part.  We had removed the genuine 50 reverser in order to use it as a template to modify the 37 item to Class 50 spec, and in the meantime the ex-37 reverser was installed in 50030's electrical cubicle so that I could judge how long to make the wiring whilst rebuilding the cubicle.

b2ap3_thumbnail_37-reverser.JPG

On Sunday May 25th I disconnected the main cables from the back of the ex-37 reverser, and with Dave Rolfe's help, got it out of 30 and into the container. I cleaned the main power contacts on the the proper 50 reverser and labelled each contact bar while Dave was finishing drilling out sheared bolts around the removable grille that gives access into the No.1 end clean air compartment. Whilst cleaning I happened to notice the auxiliary contact blocks appeared to be facing the wrong way, so I went to Washwood Heath during the week to check 50008 Thunderer, and found they had indeed been refitted the wrong way round after we had taken them apart to make a replica second set to modify the 37 reverser for use in 29.

b2ap3_thumbnail_37-reverser-out.JPG

Whilst working around the cubicle area in 50030, I was impressed by work that Mark Burrows has been doing to restore the cable conduits for the traction cabling to the main generator.  This has been a laborious task using the best parts of conduits salvaged from 50023 and 50040 before those locomotives were scrapped a few years ago.

b2ap3_thumbnail_gen-conduits.JPG

On 1st June Ian, Pete and Dave refitted the decompressor plugs into the power unit, then spent the rest of the day cleaning parts of the power unit ready for painting.

b2ap3_thumbnail_PU-work-1-June-2014.JPG

On the same day, I removed the auxiliary contact blocks from the Class 50-spec reverser and fitted them the right way round, in the process realising that the internal cams had been rotated out of their correct positions, so they wouldn't open and close in the correct sequence. The afternoon was spent getting them back into the correct alignment.  Now that the reverser has been properly adjusted, my next task will to fit it back into the electrical cubicle in 50030.

b2ap3_thumbnail_50-reveser-cleaned.JPGb2ap3_thumbnail_50-reverser-aux-contacts-corrected.JPG

Continue reading
6598 Hits
2 Comments